Computer MCQ-194

Press __ to delete one character to the right,

(A) Delete
(B) Enter
(C) Backspace
(D) Space
(E) Tab

In Access table, column is also known as __.

(A) field
(B) record
(C) data
(D) type
(E) None of these

Which action will optimize your database performance?

(A) Set the record set type to Snapshot
(B) Use the compact and repair database tool
(C) Create a replica of the database
(D) All of the above
(E) None of these

The term attribute refers to a __ of a table,

(A) Record
(B) Column
(C) Tuple
(D) Key
(E) None of these

To activate Job Costing which options require to be activated?

(A) Maintain Cost Centre
(B) Use Cost Centre for Job Costing
(C) Both a & b
(D) Maintain VAT
(E) None of these

The shortcut used for Sales Order is

(A) Alt+F4
(B) Alt+F5
(C) Alt+F7
(D) Alt+F8
(E) None of these

The common name for a modulator-demodulator is

(A) modem
(B) joiner
(C) networker
(D) connector
(E) demoder

Each computer connected to the internet must

(A) be an IBM PC
(B) have a unique IP address
(C) be internet compatible
(D) have a modem connection
(E) none of these

Which of the following functions are not performed by servers?

(A) E-mail processing
(B) Database sharing
(C) Processing web sites
(D) Storage
(E) Word processing

A __ shares hardware, software and data among authorized user,

(A) Network
(B) IP
(C) DNS
(D) CPU
(E) None of these

What is used for creating Windows applications?

(A) FOTRAN
(B) COBOL
(C) Adobe PageMaker
(D) Visual Basic
(E) None of these

In the, normal form, a composite attribute is converted to individual attributes,

(A) 1st
(B) 2nd
(C) 3rd
(D) 4th
(E) None of the above

Which of the following is/are the phase(s) of compiler?

(A) Lexical analyser
(B) Syntax analyser
(C) Code optimization
(D) Code generation
(E) All of these

Computer users who are not computer professionals are sometimes called __

(A) peripheral users
(B) programmers
(C) librarians
(D) information officers
(E) end-users

Kilobyte equals to how many bytes?

(A) 1000
(B) 1035
(C) 100
(D) 1008
(E) 1024

System proposal is prepared in __ phase of SDLC

(A) Conception
(B) Initiation
(C) Analysis
(D) Design
(E) Construction